Project Rollouts

Every site. On schedule.
Out of the box, working.

Rollouts of 20–100+ devices: batch receipt, configuration and testing, per-site kit builds and wave-based delivery to every location across Ireland & the UK — matched to your go-live calendar.

The right box, the right site, the right day. That's the whole job, and we do all of it.

Illustration of a kit box dispatched to multiple map pins
Backed byIO Resource
Per-site kits Built from your manifest — device, peripherals, cables, instructions, labels
Configured & tested Imaging, settings, asset tags and a bench test before anything ships
Wave-based dispatch Deliveries matched to your go-live calendar, next day when needed
Buffer & swap stock Failures swapped from held stock so the schedule never slips

Rollouts don't fail on site. They fail in the boxes.

A hundred devices for forty sites is really a logistics project wearing an IT badge: what arrived, what's configured, what's in which box, and whether site 23 gets its kit Tuesday. We run that project from one facility — received, staged, kitted and dispatched by technicians, backed by IO Resource, which has shipped multi-site technology deployments since 2002.

Receive the batch

Devices and peripherals from any supplier, checked against the manifest, serials captured, discrepancies flagged before they bite.

Configure & test

Imaging, settings, labelling, asset tags and a bench test per unit — done centrally where it's fast, not on site where it's expensive.

Kit & dispatch per site

One labelled consignment per location with everything the site needs, dispatched in waves to your go-live calendar.

Swap & reverse

DOA and failed units swapped from buffer stock; old equipment collected back for audit, quarantine and disposal coordination.

Built for anyone deploying at scale

If the plan says "all sites by end of quarter", we're the part that makes the plan honest.

Rollouts — frequently asked questions

What size rollout can you handle?

Our sweet spot is 20–100+ devices across multiple sites — EPoS estates, store openings, office refreshes, kiosk deployments. Larger programmes run as scheduled waves.

Can every site get a different kit?

Yes. Kits are built per site from your manifest — different device counts, peripherals, cables and instructions per location — labelled so the right box lands in the right place.

Do you configure devices before they ship?

Yes — imaging, configuration, labelling, asset-tagging and testing by technicians, so devices come out of the box working rather than needing setup on site.

Can deliveries follow our schedule?

Yes. Wave-based dispatch matched to your go-live calendar — sites get their kit the day before install, not three weeks early into a stockroom.

What happens to old equipment and failures?

We handle reverse logistics: failed units triaged and swapped from buffer stock, and decommissioned hardware collected back for audit and disposal coordination.

What does a rollout cost?

It depends on device counts, configuration depth and the delivery schedule, so we scope first and quote per project. Send the enquiry form and you'll have a personal response within one business day.

Planning a rollout?

Sixty seconds on the enquiry form — devices, sites, timeline. A personal response within one business day.

Or call +353 (0)404 20700 · info@iotechwarehousing.com